Watch: 20-tonne reservoir wall installed in three-day project

watch:-20-tonne-reservoir-wall-installed-in-three-day-project

The steel structure was lowered into place at the new reservoir in a 72-hour continuous operation.

Leave a Reply

Your email address will not be published. Required fields are marked *